United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) — page 20

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown982118.1 GW
Active in queue14.6 GW72 requests
Agreement signed8,609 MW45 requests
Withdrawn982118.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

982 requests · page 20 of 20
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + Battery Storage
Solar + storage
2.0 MWWithdrawn / abandoned Franklin, MAISO-NE Apr 2021target 2022
Verogy - Tripp RD
Solar
2.0 MWWithdrawn / abandoned Hartford, CTISO-NE Dec 2021target 2023
Hamilton Sunstrand
Solar
2.0 MWWithdrawn / abandoned Hartford, CTISO-NE Dec 2021target 2023
Distribution Wind Alternative
Onshore wind
2.0 MWWithdrawn / abandoned Grafton, NHISO-NE Mar 2008target 2012
Prospect Street substation - NG Western MA Area Cluster Study
Solar
2.0 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2020
Tower Hill Substation - NG Western RI DG Area Study
Solar
2.0 MWWithdrawn / abandoned Washington, RIISO-NE Mar 2020target 2021
CTEC Solar 186 Foster St, South Windsor
Solar
1.9 MWWithdrawn / abandoned Hartford, CTISO-NE Dec 2021target 2023
LSE Scorpuis
Solar
1.8 MWWithdrawn / abandoned Windham, CTISO-NE Dec 2021target 2023
Bowman Street 115 kV SS - Augusta Area Study
Solar
1.8 MWWithdrawn / abandoned Sagadahoc, MEISO-NE Oct 2020target 2023
Fuel Cell
Other
1.8 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2023target 2024
Bowman Street 115 kV SS - Augusta Area Study
Solar
1.7 MWWithdrawn / abandoned Kennebec, MEISO-NE Oct 2020target 2023
Crystal Spring 646 - EMA ASO
Solar + storage
1.7 MWWithdrawn / abandoned Plymouth, MAISO-NE Jun 2022target 2023
Southbridge LFGTE Engine 2
Other
1.6 MWWithdrawn / abandoned Worcester, MAISO-NE Jun 2015target 2018
Woodstock 115 kV SS - Roxbury-Rumford-Woodstock Area DG Study
Solar
1.6 MWWithdrawn / abandoned Oxford, MEISO-NE Sep 2023target 2024
Barre Mass Landfill Gas
Other
1.6 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2007target 2011
West Cranston - NG WRI DG Area Study #2 <5 MW
Solar
1.6 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2020target 2022
Mashpee 946 - EMA ASO
Solar + storage
1.5 MWWithdrawn / abandoned Barnstable, MAISO-NE Jun 2022target 2023
Depot Street Substation – NG Hopedale West Group Study
Solar + storage
1.5 MWWithdrawn / abandoned Worcester, MAISO-NE Sep 2022target 2025
Battery Addition
Other
1.5 MWWithdrawn / abandoned Rockingham, NHISO-NE Oct 2023target 2028
Wind Uprate (see QP290)
Onshore wind
1.5 MWWithdrawn / abandoned Oxford, MEISO-NE Apr 2009target 2010
Hydro
Hydro
1.3 MWWithdrawn / abandoned Rutland, VTISO-NE Nov 2014target 2014
Wind Increase
Onshore wind
1.2 MWWithdrawn / abandoned Franklin, MEISO-NE Oct 2012target 2014
Hydro Uprate
Hydro
1.0 MWWithdrawn / abandoned Androscoggin, MEISO-NE Sep 2009target 2009
Solar
Solar
1.0 MWWithdrawn / abandoned Hancock, MEISO-NE Oct 2021target 2023
Solar
Solar + storage
1.0 MWWithdrawn / abandoned Dukes, MAISO-NE Jun 2021target 2022
Solar plus Battery
Solar + storage
1.0 MWWithdrawn / abandoned Worcester, MAISO-NE Jan 2022target 2022
Solar + Battery Storage
Solar + storage
1.0 MWWithdrawn / abandoned Barnstable, MAISO-NE Apr 2021target 2022
Landfill Gas
Other
0.8 MWWithdrawn / abandoned NHISO-NE Jun 2008target 2008
Wind Increase (see Q452)
Onshore wind
0.8 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2014target 2018
Hydro Increase
Hydro
0.1 MWWithdrawn / abandoned Hampden, MAISO-NE Sep 2013target 2014
Solar plus Battery Increase (QP1129)
Solar + storage
0.0 MWWithdrawn / abandoned Bristol, MAISO-NE Aug 2022target 2022
Potter Repowering
Gas
-21.2 MWWithdrawn / abandoned Norfolk, MAISO-NE Feb 2014target 2019
Page 20 of 20

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)