United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 20
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + Battery Storage Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Verogy - Tripp RD Solar |
2.0 MW | Withdrawn / abandoned |
| Hamilton Sunstrand Solar |
2.0 MW | Withdrawn / abandoned |
| Distribution Wind Alternative Onshore wind |
2.0 MW | Withdrawn / abandoned |
| Prospect Street substation - NG Western MA Area Cluster Study Solar |
2.0 MW | Withdrawn / abandoned |
| Tower Hill Substation - NG Western RI DG Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| CTEC Solar 186 Foster St, South Windsor Solar |
1.9 MW | Withdrawn / abandoned |
| LSE Scorpuis Solar |
1.8 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
1.8 MW | Withdrawn / abandoned |
| Fuel Cell Other |
1.8 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
1.7 MW | Withdrawn / abandoned |
| Crystal Spring 646 - EMA ASO Solar + storage |
1.7 MW | Withdrawn / abandoned |
| Southbridge LFGTE Engine 2 Other |
1.6 MW | Withdrawn / abandoned |
| Woodstock 115 kV SS - Roxbury-Rumford-Woodstock Area DG Study Solar |
1.6 MW | Withdrawn / abandoned |
| Barre Mass Landfill Gas Other |
1.6 MW | Withdrawn / abandoned |
| West Cranston - NG WRI DG Area Study #2 <5 MW Solar |
1.6 MW | Withdrawn / abandoned |
| Mashpee 946 - EMA ASO Solar + storage |
1.5 MW | Withdrawn / abandoned |
| Depot Street Substation – NG Hopedale West Group Study Solar + storage |
1.5 MW | Withdrawn / abandoned |
| Battery Addition Other |
1.5 MW | Withdrawn / abandoned |
| Wind Uprate (see QP290) Onshore wind |
1.5 MW | Withdrawn / abandoned |
| Hydro Hydro |
1.3 MW | Withdrawn / abandoned |
| Wind Increase Onshore wind |
1.2 MW | Withdrawn / abandoned |
| Hydro Uprate Hydro |
1.0 MW | Withdrawn / abandoned |
| Solar Solar |
1.0 MW | Withdrawn / abandoned |
| Solar Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Landfill Gas Other |
0.8 MW | Withdrawn / abandoned |
| Wind Increase (see Q452) Onshore wind |
0.8 MW | Withdrawn / abandoned |
| Hydro Increase Hydro |
0.1 MW | Withdrawn / abandoned |
| Solar plus Battery Increase (QP1129) Solar + storage |
0.0 MW | Withdrawn / abandoned |
| Potter Repowering Gas |
-21.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)