ONSHORE WIND Β· ISO-NE

Wind Increase

Wind Increase is a 1.2 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2012 (completed)
  2. Withdrawn / abandonedFeb 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
399
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Ludden Lane Substation
Location
Franklin County, Maine
Technology
Wind: 1.2 MW
Total requested
1.2 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
1 October 2012
Proposed online date
August 2014
Withdrawn
February 2013

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem