United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Solar plus Battery Increase (QP1129)

Solar plus Battery Increase (QP1129) is a 0.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1300
Grid region
ISO-NE (New England)
Connection point (POI)
The primary connection of the proposed project to Eversource Energy is located at the Wing Lane substation #624 Transformer #1 Line #240. The site is located approximately 0.26 circuit miles from Subs
Location
Bristol County, Massachusetts
Technology
Solar: 0.0 MW · Battery
Total requested
0.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
19 August 2022
Proposed online date
August 2022
Withdrawn
October 2022

Location

Marker shows the centre of Bristol County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Bristol County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem