πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Potter Repowering

Potter Repowering is a -21.2 MW gas request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. ConsentedJan 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
438
Grid region
ISO-NE (New England)
Connection point (POI)
BELD Station 16 Switchyard
Location
Norfolk County, Massachusetts
Technology
Gas: -21.2 MW
Total requested
-21.2 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
24 February 2014
Agreement signed
2 January 2018
Proposed online date
May 2019
Withdrawn
May 2017

Location

Marker shows the centre of Norfolk County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Norfolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem