ONSHORE WIND · ISO-NE

Wind Uprate (see QP290)

Wind Uprate (see QP290) is a 1.5 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Oxford County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2009 (completed)
  2. Withdrawn / abandonedMay 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
298
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Woodstock Station
Location
Oxford County, Maine
Technology
Wind: 1.5 MW
Total requested
1.5 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 April 2009
Proposed online date
November 2010
Withdrawn
May 2009

Location

Marker shows the centre of Oxford County; the queue data does not give exact sites.

Power plants in Maine · Transmission lines in Maine

Other requests in Oxford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem