πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

SOLAR Β· ISO-NE

LSE Scorpuis

LSE Scorpuis is a 1.8 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut, connecting to NU.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2021 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1204
Grid region
ISO-NE (New England)
Utility / transmission owner
NU
Connection point (POI)
Tracy 14M
Location
Windham County, Connecticut
Technology
Solar: 1.8 MW
Total requested
1.8 MW
Queue status
Withdrawn
Entered queue
28 December 2021
Proposed online date
December 2023
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem