🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

OTHER · ISO-NE

Southbridge LFGTE Engine 2

Southbridge LFGTE Engine 2 is a 1.6 MW other request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2015 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. ConsentedJul 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
554
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
National Grid 413L4 (Existing facility POI)
Location
Worcester County, Massachusetts
Technology
Other: 1.6 MW
Total requested
1.6 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
18 June 2015
Agreement signed
19 July 2018
Proposed online date
August 2018
Withdrawn
July 2017

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem