United States › Grid › Interconnection queues › Maine
SOLAR · ISO-NEBowman Street 115 kV SS - Augusta Area Study
Bowman Street 115 kV SS - Augusta Area Study is a 1.8 MW solar request withdrawn in the ISO-NE interconnection queue, in Sagadahoc County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1075
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP RICHMOND Substation, Circuit 240D1
- Location
- Sagadahoc County, Maine
- Technology
- Solar: 1.8 MW
- Total requested
- 1.8 MW
- Queue status
- Withdrawn
- Entered queue
- 2 October 2020
- Proposed online date
- September 2023
- Withdrawn
- June 2025
Location
Marker shows the centre of Sagadahoc County; the queue data does not give exact sites.
Other requests in Sagadahoc County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem