🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Maine

SOLAR · ISO-NE

Bowman Street 115 kV SS - Augusta Area Study

Bowman Street 115 kV SS - Augusta Area Study is a 1.8 MW solar request withdrawn in the ISO-NE interconnection queue, in Sagadahoc County, Maine, connecting to CMP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2020 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1075
Grid region
ISO-NE (New England)
Utility / transmission owner
CMP
Connection point (POI)
CMP RICHMOND Substation, Circuit 240D1
Location
Sagadahoc County, Maine
Technology
Solar: 1.8 MW
Total requested
1.8 MW
Queue status
Withdrawn
Entered queue
2 October 2020
Proposed online date
September 2023
Withdrawn
June 2025

Location

Marker shows the centre of Sagadahoc County; the queue data does not give exact sites.

Power plants in Maine · Transmission lines in Maine

Other requests in Sagadahoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem