United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

SOLAR Β· ISO-NE

Solar

Solar is a 17.2 MW solar request withdrawn in the ISO-NE interconnection queue, in Sagadahoc County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1013
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 34.5kV line 43, pole 278
Location
Sagadahoc County, Maine
Technology
Solar: 17.2 MW
Total requested
17.2 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
22 April 2020
Proposed online date
October 2030
Withdrawn
September 2025

Location

Marker shows the centre of Sagadahoc County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Sagadahoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem