🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Solar + Battery Storage

Solar + Battery Storage is a 2.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1130
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 13.8kV 22B3 feeder
Location
Franklin County, Massachusetts
Technology
Solar: 2.0 MW · Battery
Total requested
2.0 MW
Service type
Network resource (NRIS)
Study phase
Not Started
Queue status
Withdrawn
Entered queue
23 April 2021
Proposed online date
April 2022
Withdrawn
September 2022

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem