United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 1.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Hancock County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1165
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 34.5kV Line on Bar Harbor Road. The 34.5 kV line from Ellsworth to Trenton is not explicitly modeled in the power flow. We added a model for this line and then tapped it at tap 30% of the total line
- Location
- Hancock County, Maine
- Technology
- Solar: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 22 October 2021
- Proposed online date
- July 2023
- Withdrawn
- June 2025
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Three Rivers SolarSolar Β· 100 MW Β· agreement signed
- Weaver WindOnshore wind Β· 72.6 MW Β· built
- Hancock Wind ProjectOnshore wind Β· 51.0 MW Β· built
- Bull Hill Wind Phase IOnshore wind Β· 34.5 MW Β· built
- Bucksport G5Other Β· 25.0 MW Β· built
- WindOnshore wind Β· 250 MW Β· withdrawn
- Solar Increase (QP1145)Solar Β· 54.1 MW Β· withdrawn
- SolarSolar Β· 51.4 MW Β· withdrawn
- SolarSolar Β· 20.7 MW Β· withdrawn
- BiomassOther Β· 18.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem