United States βΊ Grid βΊ Interconnection queues βΊ Maine
OTHER Β· ISO-NEBucksport G5
Bucksport G5 is a 25.0 MW other request built and operating in the ISO-NE interconnection queue, in Hancock County, Maine.
Request details
- Queue ID
- 347
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP 115 kV
- Location
- Hancock County, Maine
- Technology
- Other: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 7 October 2010
- Agreement signed
- 17 April 2014
- Proposed online date
- November 2012
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Three Rivers SolarSolar Β· 100 MW Β· agreement signed
- Weaver WindOnshore wind Β· 72.6 MW Β· built
- Hancock Wind ProjectOnshore wind Β· 51.0 MW Β· built
- Bull Hill Wind Phase IOnshore wind Β· 34.5 MW Β· built
- WindOnshore wind Β· 250 MW Β· withdrawn
- Solar Increase (QP1145)Solar Β· 54.1 MW Β· withdrawn
- SolarSolar Β· 51.4 MW Β· withdrawn
- SolarSolar Β· 20.7 MW Β· withdrawn
- BiomassOther Β· 18.1 MW Β· withdrawn
- SolarSolar Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem