United States › Grid › Interconnection queues › Maine
ONSHORE WIND · ISO-NEBull Hill Wind Phase I
Bull Hill Wind Phase I is a 34.5 MW onshore wind request built and operating in the ISO-NE interconnection queue, in Hancock County, Maine.
Request details
- Queue ID
- 317
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- BHE Line 66
- Location
- Hancock County, Maine
- Technology
- Wind: 34.5 MW
- Total requested
- 34.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 4 November 2009
- Agreement signed
- 31 March 2012
- Proposed online date
- October 2012
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Three Rivers SolarSolar · 100 MW · agreement signed
- Weaver WindOnshore wind · 72.6 MW · built
- Hancock Wind ProjectOnshore wind · 51.0 MW · built
- Bucksport G5Other · 25.0 MW · built
- WindOnshore wind · 250 MW · withdrawn
- Solar Increase (QP1145)Solar · 54.1 MW · withdrawn
- SolarSolar · 51.4 MW · withdrawn
- SolarSolar · 20.7 MW · withdrawn
- BiomassOther · 18.1 MW · withdrawn
- SolarSolar · 1.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem