United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OTHER Β· ISO-NE

Biomass

Biomass is a 18.1 MW other request withdrawn in the ISO-NE interconnection queue, in Hancock County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2010 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
335
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 115 kV
Location
Hancock County, Maine
Technology
Other: 18.1 MW
Total requested
18.1 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
14 May 2010
Proposed online date
March 2012
Withdrawn
June 2011

Location

Marker shows the centre of Hancock County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Hancock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem