United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Shamburger Thermal Facility Gas · Invenergy |
710 MW | Withdrawn / abandoned |
| Sweeney Gassification IGCC Project Coal · ConocoPhillips |
700 MW | Withdrawn / abandoned |
| Cedar Bayou 5 Gas · NRG Energy, Inc |
685 MW | Withdrawn / abandoned |
| Tenaska Roans Prairie Gas · Tenaska |
663 MW | Withdrawn / abandoned |
| Las Brisas Energy Center Other · Chase Power Development |
660 MW | Withdrawn / abandoned |
| Wharton County Generation #2 Gas · Suez Energy, NA |
660 MW | Withdrawn / abandoned |
| Coleto Creek Unit 2 Coal · IPA Coleto Creek LLC |
660 MW | Withdrawn / abandoned |
| Goldenrod Creek Solar Solar · Goldenrod Creek Solar LLC |
660 MW | Withdrawn / abandoned |
| Jack County III ‚Äì 138 kV Gas · Jack County Power Development, LLC |
660 MW | Withdrawn / abandoned |
| Las Brisas Energy Center Other · Chase Power Development |
660 MW | Withdrawn / abandoned |
| Indeck Wharton Gas · Indeck |
654 MW | Withdrawn / abandoned |
| SR Bertron - CCGT Gas · NRG Energy, Inc |
641 MW | Withdrawn / abandoned |
| Lakeside G Gas · MyPower Corporation |
640 MW | Withdrawn / abandoned |
| Twin Oaks 3 Other · Altura |
630 MW | Withdrawn / abandoned |
| Bastrop Peaking Generators II Gas · MPH Bastrop Peakers, LLC |
628 MW | Withdrawn / abandoned |
| Lunis Creek Solar SLF Solar · Lunis Creek Solar Project, LLC |
617 MW | Withdrawn / abandoned |
| Spinning Star Energy Onshore wind · Spinning Star Energy LLC |
615 MW | Withdrawn / abandoned |
| Cosmos Solar Solar · EDF Renewables Development, Inc. |
610 MW | Withdrawn / abandoned |
| Old Lunar Solar Solar · EDF Renewables Development, Inc. |
610 MW | Withdrawn / abandoned |
| Happy Whiteface Wind Farm Onshore wind · Chermac Energy Corp |
609 MW | Withdrawn / abandoned |
| Scandia Wind DEF Onshore wind · Scandia Wind LLC |
600 MW | Withdrawn / abandoned |
| White Park Solar Solar · 8minutenergy |
600 MW | Withdrawn / abandoned |
| Hecate McCamey C Solar Solar · Hecate Energy |
600 MW | Withdrawn / abandoned |
| Mesa Power Project Gas · Mesa Power Pampa, LLC |
600 MW | Withdrawn / abandoned |
| Bootleg Wind Onshore wind · Eurus Energy America Corporation |
600 MW | Withdrawn / abandoned |
| Union Valley G Gas · Quantum |
592 MW | Withdrawn / abandoned |
| Clear Springs G Gas · Quantum |
592 MW | Withdrawn / abandoned |
| Lamar Power Park III Gas · FPL Energy, LLC |
579 MW | Withdrawn / abandoned |
| Madison Bell Energy Center Gas · Madison Bell Partners LP |
550 MW | Withdrawn / abandoned |
| Van Alstyne G Gas · Navasota |
548 MW | Withdrawn / abandoned |
| Panda Sherman 2 G Gas · Panda Funds |
543 MW | Withdrawn / abandoned |
| Zeus Armstrong BESS II Battery storage · Zeus Armstrong BESS II, LLC |
537 MW | Withdrawn / abandoned |
| Apis Solar Solar · S&S Renewables LLC |
534 MW | Withdrawn / abandoned |
| Dundee East A Wind Placeholder Onshore wind · Felix 2, LLC |
524 MW | Withdrawn / abandoned |
| OFFERED Combined Cycle Gen Gas · Blue Cube Operations |
520 MW | Withdrawn / abandoned |
| Roscoe 3 Onshore wind · Airtricity, Inc |
516 MW | Withdrawn / abandoned |
| Bronze Fork Solar Solar · EDF Renewables Development, Inc. |
516 MW | Withdrawn / abandoned |
| Point Mountain Solar Solar · Hecate Energy |
514 MW | Withdrawn / abandoned |
| Point Mountain Solar Solar · Hecate Energy Point Mountain LLC |
514 MW | Withdrawn / abandoned |
| Brinton Fork Solar Solar · EDF Renewables Development, Inc. |
514 MW | Withdrawn / abandoned |
| Paluxy Storage Battery storage · S&S Renewables LLC |
512 MW | Withdrawn / abandoned |
| Amsterdam Solar II Solar · Cottonwood Bayou Solar II, LLC |
510 MW | Withdrawn / abandoned |
| Amsterdam Solar Solar · Cottonwood Bayou Solar II, LLC |
510 MW | Withdrawn / abandoned |
| Shinnery Hill Solar Solar · EDF Renewables Development, Inc. |
503 MW | Withdrawn / abandoned |
| Ventana Ranch Solar Solar · Monarch Energy Development LLC |
502 MW | Withdrawn / abandoned |
| Green Bird Solar Solar · Gigawatt Solar LLC |
502 MW | Withdrawn / abandoned |
| Hugo Plant Coal · Brazos Electric Power Coop |
500 MW | Withdrawn / abandoned |
| Sherbino Mesa III Onshore wind · BP Wind Energy North America, Inc |
500 MW | Withdrawn / abandoned |
| Pampa Wind Onshore wind · Avangrid |
500 MW | Withdrawn / abandoned |
| Sherbino Mesa II Onshore wind · Orion Energy |
500 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)