United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Old Lunar Solar

Old Lunar Solar is a 610 MW solar request withdrawn in the ERCOT interconnection queue, in Wharton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0481
Grid region
ERCOT (Texas)
Developer
EDF Renewables Development, Inc.
Connection point (POI)
tap 345kV 5133 Elm Creek - 5915 STP (CKT 1)
Location
Wharton County, Texas
Technology
Solar: 610 MW
Total requested
610 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 December 2019
Proposed online date
June 2029
Withdrawn
May 2024

Location

Marker shows the centre of Wharton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wharton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem