United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Tenaska Roans Prairie

Tenaska Roans Prairie is a 663 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0008
Grid region
ERCOT (Texas)
Developer
Tenaska
Connection point (POI)
tap 345kV 44645 Singleton - 46500 Tomball
Technology
Gas: 663 MW
Total requested
663 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
2 January 2013
Agreement signed
17 November 2014
Proposed online date
April 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem