United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Zeus Armstrong BESS II

Zeus Armstrong BESS II is a 537 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0360
Grid region
ERCOT (Texas)
Developer
Zeus Armstrong BESS II, LLC
Connection point (POI)
Tap 345KV 23900 Alibates - 23914 Tulecnyn
Technology
Battery: 537 MW
Total requested
537 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
April 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem