United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Panda Sherman 2 G

Panda Sherman 2 G is a 543 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2015 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0005
Grid region
ERCOT (Texas)
Developer
Panda Funds
Connection point (POI)
1758 Payne 138kV
Technology
Gas: 543 MW
Total requested
543 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 January 2015
Proposed online date
December 2020
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem