πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

OFFERED Combined Cycle Gen

OFFERED Combined Cycle Gen is a 520 MW gas request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0256
Grid region
ERCOT (Texas)
Developer
Blue Cube Operations
Connection point (POI)
Tap 42215 Copper - 42199 BSTCM12_36_8 CKT36
Location
Brazoria County, Texas
Technology
Gas: 520 MW
Total requested
520 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 December 2022
Proposed online date
August 2025
Withdrawn
September 2023

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem