United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Indeck Wharton

Indeck Wharton is a 654 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2012 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. ConsentedSep 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0023
Grid region
ERCOT (Texas)
Developer
Indeck
Connection point (POI)
tap 345kV 44200 Hillje - 44000 WAP
Technology
Gas: 654 MW
Total requested
654 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
5 November 2012
Agreement signed
15 September 2014
Proposed online date
September 2021
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem