United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTPoint Mountain Solar
Point Mountain Solar is a 514 MW solar request withdrawn in the ERCOT interconnection queue, in Crane County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0236
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy Point Mountain LLC
- Connection point (POI)
- 76000 North McCamey 345kV
- Location
- Crane County, Texas
- Technology
- Solar: 514 MW
- Total requested
- 514 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 25 August 2019
- Proposed online date
- December 2024
- Withdrawn
- July 2022
Location
Marker shows the centre of Crane County; the queue data does not give exact sites.
Other requests in Crane County
- Soda Lake BESS 1Battery storage Β· 204 MW Β· agreement signed
- Soda Lake Solar 2 SLFSolar + storage Β· 202 MW Β· agreement signed
- Tri-X Solar 1 SLFSolar + storage Β· 202 MW Β· agreement signed
- Western Flats StorageSolar + storage Β· 411 MW Β· in study
- Western Flats SolarSolar + storage Β· 410 MW Β· in study
- Cattle Drive SolarSolar Β· 307 MW Β· in study
- Soda Lake BESS 2 SLFSolar + storage Β· 205 MW Β· in study
- Tri-X BESS 1 SLFSolar + storage Β· 205 MW Β· in study
- BRP Pictor BESSBattery storage Β· 201 MW Β· in study
- BRP Ampato BESSBattery storage Β· 122 MW Β· in study
- Fowler Ranch StorageBattery storage Β· 26.1 MW Β· in study
- Tri-County SolarSolar Β· 178 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem