United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTFowler Ranch Storage
Fowler Ranch Storage is a 26.1 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Crane County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0308
- Grid region
- ERCOT (Texas)
- Developer
- Crane BESS, LLC
- Connection point (POI)
- 76025 Castle Mountain 138kV
- Location
- Crane County, Texas
- Technology
- Battery: 26.1 MW
- Total requested
- 26.1 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 21 June 2021
- Proposed online date
- January 2027
Location
Marker shows the centre of Crane County; the queue data does not give exact sites.
Other requests in Crane County
- Soda Lake BESS 1Battery storage · 204 MW · agreement signed
- Soda Lake Solar 2 SLFSolar + storage · 202 MW · agreement signed
- Tri-X Solar 1 SLFSolar + storage · 202 MW · agreement signed
- Western Flats StorageSolar + storage · 411 MW · in study
- Western Flats SolarSolar + storage · 410 MW · in study
- Cattle Drive SolarSolar · 307 MW · in study
- Soda Lake BESS 2 SLFSolar + storage · 205 MW · in study
- Tri-X BESS 1 SLFSolar + storage · 205 MW · in study
- BRP Pictor BESSBattery storage · 201 MW · in study
- BRP Ampato BESSBattery storage · 122 MW · in study
- Tri-County SolarSolar · 178 MW · suspended
- Crossett Power BattOther · 203 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem