United States › Grid › Interconnection queues › Texas
OTHER · ERCOTCrossett Power Batt
Crossett Power Batt is a 203 MW other request built and operating in the ERCOT interconnection queue, in Crane County, Texas.
Request details
- Queue ID
- 21INR0510
- Grid region
- ERCOT (Texas)
- Developer
- Crossett Power Management LLC
- Connection point (POI)
- 76026 Soda Lake 138kV
- Location
- Crane County, Texas
- Technology
- Other: 203 MW
- Total requested
- 203 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 2 June 2020
- Agreement signed
- 5 August 2020
- Proposed online date
- May 2022
- Came online
- May 2022
Location
Marker shows the centre of Crane County; the queue data does not give exact sites.
Other requests in Crane County
- Soda Lake BESS 1Battery storage · 204 MW · agreement signed
- Soda Lake Solar 2 SLFSolar + storage · 202 MW · agreement signed
- Tri-X Solar 1 SLFSolar + storage · 202 MW · agreement signed
- Western Flats StorageSolar + storage · 411 MW · in study
- Western Flats SolarSolar + storage · 410 MW · in study
- Cattle Drive SolarSolar · 307 MW · in study
- Soda Lake BESS 2 SLFSolar + storage · 205 MW · in study
- Tri-X BESS 1 SLFSolar + storage · 205 MW · in study
- BRP Pictor BESSBattery storage · 201 MW · in study
- BRP Ampato BESSBattery storage · 122 MW · in study
- Fowler Ranch StorageBattery storage · 26.1 MW · in study
- Tri-County SolarSolar · 178 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem