Twin Oaks 3

Twin Oaks 3 is a 630 MW other request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
11INR0001
Grid region
ERCOT (Texas)
Developer
Altura
Technology
Other: 630 MW
Total requested
630 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 August 2005
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in