United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA (2021 requests) — page 16
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Starling Storage Solar + storage · Starling Storage, LLC |
63.6 MW | Agreement signed |
| Solar project J2029, Marquette County Solar |
62.5 MW | In study |
| Honeycomb Solar SLF Solar + storage · Honeycomb Solar, LLC |
61.4 MW | Agreement signed |
| Orange Grove BESS Solar + storage · Talitha Energy Project, LLC |
61.4 MW | Agreement signed |
| Bird Dog Energy Storage Battery storage · VESI 37 LLC |
60.4 MW | Agreement signed |
| Oriana BESS Solar + storage · Oriana Solar LLC |
60.3 MW | Agreement signed |
| Lampe Solar Solar · Gransolar Texas Seven LLC |
60.2 MW | In study |
| Surplus; J878 Other |
60.0 MW | In study |
| Solar project J1889, Linn County Solar |
60.0 MW | In study |
| Battery storage project J1863, Otsego County Battery storage |
60.0 MW | In study |
| Battery storage project J1880, Ottawa County Battery storage |
60.0 MW | In study |
| Edwards Calverton Battery Storage Battery storage · Edwards Calverton Battery Storage |
60.0 MW | In study |
| Battery storage project AH2-032, Prince William County Battery storage |
60.0 MW | In study |
| Battery storage project G0708, Morrow County Battery storage |
60.0 MW | In study |
| Battery storage project G0707, Morrow County Battery storage |
60.0 MW | In study |
| Solar project J1649, Mccracken County Solar |
60.0 MW | In study |
| Battery storage project AH2-033, Prince William County Battery storage |
60.0 MW | In study |
| Solar + storage project IC-955, Lowndes County Solar + storage |
58.0 MW | Paused / redesign |
| Solar + storage project Company 193, Clark County Solar + storage |
57.0 MW | Agreement signed |
| Whistle Solar Solar · Gransolar Texas Nineteen, LLC |
56.3 MW | In study |
| Bynum Solar Project Solar · Bynum Solar Project, LLC |
56.0 MW | Agreement signed |
| Battery storage project AH2-061, Prince William County Battery storage |
55.0 MW | In study |
| Battery storage project AH2-060, Prince William County Battery storage |
55.0 MW | In study |
| Fighting Jays Battery Battery storage |
53.2 MW | Paused / redesign |
| Mayacamas Geothermal Geothermal |
53.0 MW | In study |
| Sunbelt Storage Solar + storage · Rose Hill Solar LLC |
52.0 MW | In study |
| Steppe Reserve Storage Battery storage · KCE TX 25, LLC |
51.9 MW | In study |
| High Chaparral BESS 138kV Battery storage · High Chaparral Solar Project, LLC |
51.7 MW | Paused / redesign |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Big River BESS Solar + storage · Rio Grande River Solar LLC |
51.3 MW | In study |
| Orleans Solar + storage |
51.1 MW | Agreement signed |
| Lumberjack Storage Battery storage · EDP Renewables North America LLC |
50.9 MW | Agreement signed |
| Midpoint Storage Battery storage · Midpoint Solar, LLC |
50.9 MW | Agreement signed |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Findley Solar Solar + storage · Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Husky Solar Solar |
50.2 MW | Agreement signed |
| Makalu Solar Solar · Abei Energy Green X LLC |
50.2 MW | In study |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Solar project J1935, Dane County Solar |
50.0 MW | In study |
| Solar project 165, Georgetown County Solar |
50.0 MW | Under construction |
| Solar project J2292, Calcasieu Parish County Solar |
50.0 MW | In study |
| Zinnia Storage Battery storage |
50.0 MW | Agreement signed |
| Solar project J1529, Carroll County Solar |
50.0 MW | In study |
| Battery storage project GEN-2021-042, Jackson County Battery storage |
50.0 MW | Agreement signed |
| Limewood Storage Solar + storage · Limewood Bell Renewables LLC |
50.0 MW | Agreement signed |
| Solar + storage project 417, Wheatland County Solar + storage |
50.0 MW | In study |
| Battery storage project J2159, Clark County Battery storage |
50.0 MW | In study |
| Solar project J1530, Mills County Solar |
50.0 MW | In study |
| Battery storage project J1984, Ottawa County Battery storage |
50.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)228 · 68.8 GW
- CAISO (California)138 · 66.9 GW
- ERCOT (Texas)207 · 39.5 GW
- MISO (Midcontinent)136 · 23.7 GW
- Southeast (non-ISO utilities)63 · 12.7 GW
- SPP (Southwest Power Pool)44 · 9,029 MW
- ISO-NE (New England)20 · 3,998 MW
- PJM (Mid-Atlantic, Midwest)49 · 2,072 MW
- NYISO (New York)11 · 991 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)