United States › Grid › Interconnection queues › Iowa
SOLAR · MISOSolar project J1530, Mills County
Solar project J1530, Mills County is a 50.0 MW solar request in interconnection study in the MISO interconnection queue, in Mills County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusIn planning
- PlanningQueued Apr 2021 (current stage)
- ConsentedAug 2024 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J1530
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint
- Location
- Mills County, Iowa
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 16 April 2021
- Agreement signed
- 5 August 2024
- Proposed online date
- March 2026
Location
Marker shows the centre of Mills County; the queue data does not give exact sites.
Other requests in Mills County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem