United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 120
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hudson Solar 2 Solar + storage |
204 MW | Withdrawn / abandoned |
| Kochab Solar Solar · Kochab Energy Project, LLC |
204 MW | Withdrawn / abandoned |
| Solar project 710, Kane County Solar |
204 MW | Withdrawn / abandoned |
| Waterside Power - 180 MW Gas |
204 MW | Withdrawn / abandoned |
| Flagtail Batt Other · Flagtail LLC |
204 MW | Withdrawn / abandoned |
| Brushwood Energy Storage Other · Flagtail LLC |
204 MW | Withdrawn / abandoned |
| Flagtail BESS Battery storage · Flagtail LLC |
204 MW | Withdrawn / abandoned |
| Vermillion Energy Storage Battery storage |
204 MW | Withdrawn / abandoned |
| LH Energy Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Austin Es Battery storage |
204 MW | Withdrawn / abandoned |
| Spindrift Hybrid Solar Solar + storage |
204 MW | Withdrawn / abandoned |
| Solar project G0833, Adams County Solar |
204 MW | Withdrawn / abandoned |
| Webb County Renewables Storage Other · Webb County Renewables, LLC |
203 MW | Withdrawn / abandoned |
| Webb County Renewables Solar Solar · Webb County Renewables, LLC |
203 MW | Withdrawn / abandoned |
| Solar project GEN-2018-038, Ray County Solar |
203 MW | Withdrawn / abandoned |
| Ellis BESS Battery storage |
203 MW | Withdrawn / abandoned |
| Medellin Road BESS Other · Horizon Energy Storage Green Field |
203 MW | Withdrawn / abandoned |
| Gas project CS24-05, Kootenai County Gas |
203 MW | Withdrawn / abandoned |
| Battery storage project GEN-2021-012, Beckham County Battery storage |
203 MW | Withdrawn / abandoned |
| Gas project GEN-2012-038, Floyd County Gas |
203 MW | Withdrawn / abandoned |
| Other project 48, Davidson County Other |
203 MW | Withdrawn / abandoned |
| Ibra Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2021-024, Lamoure County Onshore wind |
203 MW | Withdrawn / abandoned |
| Ronaldo Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Unity Wind Onshore wind · Miller Wind |
203 MW | Withdrawn / abandoned |
| Gas project GEN-2014-068, Deaf Smith County Gas |
203 MW | Withdrawn / abandoned |
| Kruth Storage Battery storage · Martinez Energy Storage LLC |
203 MW | Withdrawn / abandoned |
| Seis Puntos Solar Solar |
203 MW | Withdrawn / abandoned |
| BRP Lyra BESS Other · BRP Lyra BESS LLC |
203 MW | Withdrawn / abandoned |
| Corbin Grid BESS Other · Corbin Grid, LLC |
203 MW | Withdrawn / abandoned |
| Sargasso Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Soda Lake Solar 1 Solar · Arrington Solar |
203 MW | Withdrawn / abandoned |
| Wekiva Grid Battery storage · Wekiva Grid, LLC |
203 MW | Withdrawn / abandoned |
| Onshore wind project APP-100087 Onshore wind |
203 MW | Withdrawn / abandoned |
| Onshore wind project 74, Baker County Onshore wind |
203 MW | Withdrawn / abandoned |
| Solar + storage project AF1-142, Clearfield County Solar + storage · Moonlight Flats Solar Power, LLC |
202 MW | Withdrawn / abandoned |
| Streamfield Battery storage |
202 MW | Withdrawn / abandoned |
| BRP Tigris BESS Other · BRP Tigris BESS LLC |
202 MW | Withdrawn / abandoned |
| BRP Springbok Solar Solar · Antelope Solar LLC |
202 MW | Withdrawn / abandoned |
| Sibyl Energy Storage Other · WattBridge Energy, LLC |
202 MW | Withdrawn / abandoned |
| Icebox Energy Storage Battery storage · Grid Connected Infrastructure, LLC |
202 MW | Withdrawn / abandoned |
| Topaz Energy Storage Other · WattBridge Energy, LLC |
202 MW | Withdrawn / abandoned |
| BRP Chena BESS Battery storage · BRP Chena BESS LLC |
202 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-063, Rush County Onshore wind |
202 MW | Withdrawn / abandoned |
| Salix Solar + storage |
202 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2016-165, Knox County Onshore wind |
202 MW | Withdrawn / abandoned |
| Battery storage project GEN-2020-023, Garfield County Battery storage |
202 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2009-036, Murray County Onshore wind |
202 MW | Withdrawn / abandoned |
| Battery storage project GEN-2017-199, Beadle County Battery storage |
202 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)