United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· SPP

Onshore wind project GEN-2021-024, Lamoure County

Onshore wind project GEN-2021-024, Lamoure County is a 203 MW onshore wind request withdrawn in the SPP interconnection queue, in Lamoure County, North Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-024
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
WAPA 230kV Jamestown Substation
Location
Lamoure County, North Dakota
Technology
Wind: 203 MW
Total requested
203 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
14 May 2021
Proposed online date
December 2026
Withdrawn
September 2024

Location

Marker shows the centre of Lamoure County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Lamoure County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem