πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· PJM

Onshore wind project T35, Lamoure County

Onshore wind project T35, Lamoure County is a 1,500 MW onshore wind request withdrawn in the PJM interconnection queue, in Lamoure County, North Dakota, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2007 (completed)
  2. Withdrawn / abandonedApr 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
T35
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Byron Wind IV
Location
Lamoure County, North Dakota
Technology
Wind: 1,500 MW
Total requested
1,500 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
12 September 2007
Proposed online date
September 2014
Withdrawn
April 2010

Location

Marker shows the centre of Lamoure County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Lamoure County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem