United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· SPP

Gas project GEN-2014-068, Deaf Smith County

Gas project GEN-2014-068, Deaf Smith County is a 203 MW gas request withdrawn in the SPP interconnection queue, in Deaf Smith County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2014-068
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tap Deaf Smith - Plant X 230 kV line
Location
Deaf Smith County, Texas
Technology
Gas: 203 MW
Total requested
203 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 September 2014
Proposed online date
March 2019
Withdrawn
September 2015

Location

Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Deaf Smith County