ONSHORE WIND Β· ERCOT

Unity Wind

Unity Wind is a 203 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2013 (completed)
  2. Withdrawn / abandonedSep 2018 (project stopped here)
  3. ConsentedOct 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0050
Grid region
ERCOT (Texas)
Developer
Miller Wind
Connection point (POI)
79502 Windmill 345kV
Technology
Wind: 203 MW
Total requested
203 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
19 September 2013
Agreement signed
3 October 2014
Proposed online date
October 2019
Withdrawn
September 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem