United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTUnity Wind
Unity Wind is a 203 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2013 (completed)
- Withdrawn / abandonedSep 2018 (project stopped here)
- ConsentedOct 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 15INR0050
- Grid region
- ERCOT (Texas)
- Developer
- Miller Wind
- Connection point (POI)
- 79502 Windmill 345kV
- Technology
- Wind: 203 MW
- Total requested
- 203 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 19 September 2013
- Agreement signed
- 3 October 2014
- Proposed online date
- October 2019
- Withdrawn
- September 2018
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem