United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2009-036, Murray County
Onshore wind project GEN-2009-036, Murray County is a 202 MW onshore wind request withdrawn in the SPP interconnection queue, in Murray County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2009-036
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Sunnyside - Lawton Eastside 345kV
- Location
- Murray County, Oklahoma
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 27 August 2009
- Proposed online date
- May 2011
Location
Marker shows the centre of Murray County; the queue data does not give exact sites.
Other requests in Murray County
- Battery storage project GEN-2024-164, Murray CountyBattery storage Β· 199 MW Β· in study
- Solar + storage project GEN-2024-219, Murray CountySolar + storage Β· 160 MW Β· in study
- Onshore wind project GEN-2016-126, Murray CountyOnshore wind Β· 173 MW Β· built
- Onshore wind project GEN-2011-040, Murray CountyOnshore wind Β· 111 MW Β· built
- Onshore wind project GEN-2013-007, Murray CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project GEN-2009-037, Murray CountyOnshore wind Β· 202 MW Β· withdrawn
- Onshore wind project GEN-2010-004, Murray CountyOnshore wind Β· 202 MW Β· withdrawn
- Onshore wind project GEN-2008-046, Murray CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2024-390, Murray CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2011-013, Murray CountyOnshore wind Β· 102 MW Β· withdrawn
- Onshore wind project GEN-2008-033, Murray CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2008-034, Murray CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem