United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2011-013, Murray County

Onshore wind project GEN-2011-013, Murray County is a 102 MW onshore wind request withdrawn in the SPP interconnection queue, in Murray County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedSep 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2011-013
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Sunnyside 345kV
Location
Murray County, Oklahoma
Technology
Wind: 102 MW
Total requested
102 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
December 2012
Withdrawn
September 2011

Location

Marker shows the centre of Murray County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Murray County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem