United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· ERCOTKruth Storage
Kruth Storage is a 203 MW battery storage request withdrawn in the ERCOT interconnection queue, in Angelina County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0252
- Grid region
- ERCOT (Texas)
- Developer
- Martinez Energy Storage LLC
- Connection point (POI)
- 3319 Redland 138kV
- Location
- Angelina County, Texas
- Technology
- Battery: 203 MW
- Total requested
- 203 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 February 2022
- Proposed online date
- March 2026
- Withdrawn
- November 2025
Location
Marker shows the centre of Angelina County; the queue data does not give exact sites.
Other requests in Angelina County
- Azalea Springs SolarSolar Β· 181 MW Β· agreement signed
- Longleaf Power StationGas Β· 600 MW Β· in study
- Champion Road BESSBattery storage Β· 206 MW Β· in study
- Sun Angel ESSBattery storage Β· 202 MW Β· in study
- Solar Star North Herty StorageBattery storage Β· 126 MW Β· in study
- Diboll BessOther Β· 10.0 MW Β· built
- Lufkin South BESSOther Β· 10.0 MW Β· built
- HERON1Gas Β· 150 MW Β· withdrawn
- AvocetGas Β· 150 MW Β· withdrawn
- Jefferson Enterprise EnergyOther Β· 53.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem