United States › Grid › Interconnection queues › Texas
OTHER · ERCOTLufkin South BESS
Lufkin South BESS is a 10.0 MW other request built and operating in the ERCOT interconnection queue, in Angelina County, Texas.
Request details
- Queue ID
- 24INR0587
- Grid region
- ERCOT (Texas)
- Developer
- HEN INFRASTRUCTURE LLC 1
- Connection point (POI)
- LDLXFMR1/3328/LFSTH
- Location
- Angelina County, Texas
- Technology
- Other: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 12 June 2023
- Proposed online date
- February 2024
- Came online
- February 2024
Location
Marker shows the centre of Angelina County; the queue data does not give exact sites.
Other requests in Angelina County
- Azalea Springs SolarSolar · 181 MW · agreement signed
- Longleaf Power StationGas · 600 MW · in study
- Champion Road BESSBattery storage · 206 MW · in study
- Sun Angel ESSBattery storage · 202 MW · in study
- Solar Star North Herty StorageBattery storage · 126 MW · in study
- Diboll BessOther · 10.0 MW · built
- Kruth StorageBattery storage · 203 MW · withdrawn
- HERON1Gas · 150 MW · withdrawn
- AvocetGas · 150 MW · withdrawn
- Jefferson Enterprise EnergyOther · 53.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem