BATTERY STORAGE · ERCOTChampion Road BESS
Champion Road BESS is a 206 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Angelina County, Texas.
Queue statusIn planning
- PlanningQueued Feb 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 28INR0300
- Grid region
- ERCOT (Texas)
- Developer
- Horizon Energy Storage Greenfield Project Holdings LLC
- Connection point (POI)
- 138 kV Tap 3328 Lufkin South - 3324 Lufkin Switch Tap East
- Location
- Angelina County, Texas
- Technology
- Battery: 206 MW
- Total requested
- 206 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 14 February 2025
- Proposed online date
- September 2028
Location
Marker shows the centre of Angelina County; the queue data does not give exact sites.
Other requests in Angelina County
- Azalea Springs SolarSolar · 181 MW · agreement signed
- Longleaf Power StationGas · 600 MW · in study
- Sun Angel ESSBattery storage · 202 MW · in study
- Solar Star North Herty StorageBattery storage · 126 MW · in study
- Diboll BessOther · 10.0 MW · built
- Lufkin South BESSOther · 10.0 MW · built
- Kruth StorageBattery storage · 203 MW · withdrawn
- HERON1Gas · 150 MW · withdrawn
- AvocetGas · 150 MW · withdrawn
- Jefferson Enterprise EnergyOther · 53.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem