United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
BATTERY STORAGE Β· SPPBattery storage project GEN-2021-012, Beckham County
Battery storage project GEN-2021-012, Beckham County is a 203 MW battery storage request withdrawn in the SPP interconnection queue, in Beckham County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-012
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Border 345 kV interconnection substation
- Location
- Beckham County, Oklahoma
- Technology
- Battery: 203 MW
- Total requested
- 203 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 April 2021
- Proposed online date
- December 2029
- Withdrawn
- July 2025
Location
Marker shows the centre of Beckham County; the queue data does not give exact sites.
Other requests in Beckham County
- Solar project GEN-2024-154, Beckham CountySolar Β· 200 MW Β· in study
- Onshore wind project GEN-2006-035, Beckham CountyOnshore wind Β· 132 MW Β· built
- Onshore wind project GEN-2006-002, Beckham CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project GEN-2006-043, Beckham CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project GEN-2011-049, Beckham CountyOnshore wind Β· 251 MW Β· withdrawn
- Solar project GEN-2021-010, Beckham CountySolar Β· 208 MW Β· withdrawn
- Solar project GEN-2021-014, Beckham CountySolar Β· 208 MW Β· withdrawn
- Onshore wind project GEN-2015-071, Beckham CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2008-039, Beckham CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2009-070, Beckham CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2010-018, Beckham CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project GEN-2009-016, Beckham CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem