BATTERY STORAGE Β· SPP

Battery storage project GEN-2017-199, Beadle County

Battery storage project GEN-2017-199, Beadle County is a 202 MW battery storage request withdrawn in the SPP interconnection queue, in Beadle County, South Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandonedMay 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-199
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Groton 345kV Substation
Location
Beadle County, South Dakota
Technology
Battery: 202 MW
Total requested
202 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2017
Proposed online date
December 2026
Withdrawn
May 2023

Location

Marker shows the centre of Beadle County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Beadle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem