United States › Grid › Interconnection queues › South Dakota
OTHER · WESTOther project GI-0908, Beadle County
Other project GI-0908, Beadle County is a 2.0 MW other request built and operating in the West interconnection queue, in Beadle County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0908
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- Northwestern Energy
- Connection point (POI)
- Huron 115kV [Huron WestPark 69kV
- Location
- Beadle County, South Dakota
- Technology
- Oil: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 11 February 2009
- Proposed online date
- April 2009
Location
Marker shows the centre of Beadle County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Beadle County
- Gas project 462, Beadle CountyGas · 2.0 MW · in study
- Gas project 463, Beadle CountyGas · 0.5 MW · in study
- Gas project 364, Beadle CountyGas · 57.8 MW · built
- Gas project 414, Beadle CountyGas · 2.2 MW · built
- Solar project 336, Beadle CountySolar · 0.1 MW · built
- Coal project GI-0318, Beadle CountyCoal · 500 MW · withdrawn
- Onshore wind project GEN-2017-200, Beadle CountyOnshore wind · 302 MW · withdrawn
- Battery storage project GEN-2021-009, Beadle CountyBattery storage · 225 MW · withdrawn
- Battery storage project GEN-2017-199, Beadle CountyBattery storage · 202 MW · withdrawn
- Coal project GI-0607, Beadle CountyCoal · 100 MW · withdrawn
- Coal project GI-0323, Beadle CountyCoal · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem