United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
BATTERY STORAGE Β· SPPBattery storage project GEN-2021-009, Beadle County
Battery storage project GEN-2021-009, Beadle County is a 225 MW battery storage request withdrawn in the SPP interconnection queue, in Beadle County, South Dakota, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2021 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-009
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Carpenter 230kV substation in Clark county, South Dakota
- Location
- Beadle County, South Dakota
- Technology
- Battery: 225 MW
- Total requested
- 225 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 11 May 2021
- Proposed online date
- March 2026
- Withdrawn
- July 2023
Location
Marker shows the centre of Beadle County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Beadle County
- Gas project 462, Beadle CountyGas Β· 2.0 MW Β· in study
- Gas project 463, Beadle CountyGas Β· 0.5 MW Β· in study
- Gas project 364, Beadle CountyGas Β· 57.8 MW Β· built
- Gas project 414, Beadle CountyGas Β· 2.2 MW Β· built
- Other project GI-0908, Beadle CountyOther Β· 2.0 MW Β· built
- Solar project 336, Beadle CountySolar Β· 0.1 MW Β· built
- Coal project GI-0318, Beadle CountyCoal Β· 500 MW Β· withdrawn
- Onshore wind project GEN-2017-200, Beadle CountyOnshore wind Β· 302 MW Β· withdrawn
- Battery storage project GEN-2017-199, Beadle CountyBattery storage Β· 202 MW Β· withdrawn
- Coal project GI-0607, Beadle CountyCoal Β· 100 MW Β· withdrawn
- Coal project GI-0323, Beadle CountyCoal Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem