United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Soda Lake Solar 1

Soda Lake Solar 1 is a 203 MW solar request withdrawn in the ERCOT interconnection queue, in Crane County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedAug 2020 (project stopped here)
  3. ConsentedAug 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0040
Grid region
ERCOT (Texas)
Developer
Arrington Solar
Connection point (POI)
Tap 138kV 6601 Rio Pecos - 60014 Spudder
Location
Crane County, Texas
Technology
Solar: 203 MW
Total requested
203 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
6 October 2016
Agreement signed
20 August 2018
Proposed online date
May 2023
Withdrawn
August 2020

Location

Marker shows the centre of Crane County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Crane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem