Onshore wind project GEN-2016-165, Knox County

Onshore wind project GEN-2016-165, Knox County is a 202 MW onshore wind request withdrawn in the SPP interconnection queue, in Knox County, Nebraska, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-165
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Grand Prairie 345 kV
Location
Knox County, Nebraska
Technology
Wind: 202 MW
Total requested
202 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2016
Proposed online date
December 2019
Withdrawn
September 2019

Location

Marker shows the centre of Knox County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Knox County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem