πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

ONSHORE WIND Β· SPP

Onshore wind project GEN-2014-023, Knox County

Onshore wind project GEN-2014-023, Knox County is a 79.9 MW onshore wind request withdrawn in the SPP interconnection queue, in Knox County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2014-023
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Tap Fort Randall β€šΓ„Γ¬ Meadow Grove 230kV
Location
Knox County, Nebraska
Technology
Wind: 79.9 MW
Total requested
79.9 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
9 September 2014
Proposed online date
December 2015
Withdrawn
September 2015

Location

Marker shows the centre of Knox County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Knox County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem