Ellis BESS

Ellis BESS is a 203 MW battery storage request withdrawn in the CAISO interconnection queue, in Orange County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1606
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Ellis Substation 220kV
Location
Orange County, California
Technology
Battery: 203 MW
Total requested
203 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
October 2021
Withdrawn
July 2019

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem