Onshore wind projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown14612.1 GW in total
In planning81scoping or awaiting consent
Consented or building20closest to connecting
Built45connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

146 projects · page 1 of 3
ProjectCapacityStageConnection siteFrom
Dorenell Windfarm Extension
Onshore wind · Dorenell Windfarm Extension Limited
610 MWScoping Dorenell Extension Wind Farm 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Viking Wind Farm
Onshore wind · Viking Energy Wind Farm LLP
434 MWBuilt Kergord GSP
SSEN Transmission (north Scotland)
Peninsula Energy Park
Onshore wind · Renantis UK Limited
250 MWScoping PENINSULA ENERGY PARK 220kV SUBSTATION
SSEN Transmission (north Scotland)
Oct 2035
Glen Ullinish Extension
Onshore wind · Glen Ullinish Wf 2 Ltd
240 MWAwaiting Consents Glen Ullinish Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Stronelairg
Onshore wind · Stronelairg Wind Farm Limited
228 MWBuilt Stronelairg 132/33kV Substation
SSEN Transmission (north Scotland)
Garvary Wind Farm
Onshore wind · Garvary Wind Farm Limited
222 MWScoping Garvary 132kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Strathy South Wind
Onshore wind · Sse Generation Limited
208 MWConsents Approved Strathy South 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Cloiche Wind Farm
Onshore wind · Sse Generation Limited
200 MWScoping Cloiche 132/33kV Substation
SSEN Transmission (north Scotland)
Feb 2028
Inveroykel Wind Farm
Onshore wind · Rwe Renewables UK Swindon Limited
191 MWScoping Inveroykel Wind Farm 132kV
SSEN Transmission (north Scotland)
Oct 2031
Griffin Wind Farm
Onshore wind · Griffin Wind Farm Limited
189 MWBuilt Griffin 132/33kV Substation
SSEN Transmission (north Scotland)
Stornoway Wind Farm
Onshore wind · Stornoway Wind Farm Limited
180 MWConsents Approved Arnish 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Dorenell Windfarm
Onshore wind · Dorenell Windfarm Limited
177 MWBuilt Dorenell 132/33kV Substation
SSEN Transmission (north Scotland)
Elchies Wind Farm
Onshore wind · Elchies Wind Limited
170 MWScoping Elchies 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2028
Glendye Wind Farm
Onshore wind · Glendye Wind Farm Limited
167 MWScoping Glendye Wind Farm Substation
SSEN Transmission (north Scotland)
Apr 2034
Tioram Wind Farm
Onshore wind · Invenergy Development UK Ltd
160 MWScoping New Carradale 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2037
Ruith Cnoc
Onshore wind · Ruith Cnoc Wind Farm Limited
158 MWScoping New Dalchork 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Drum of Clunas Wind and Solar Park
Onshore wind · Broadhaven Distribution Limited
150 MWScoping Drum Of Clunas Wind 275Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
Clashindarroch Windfarm Extension
Onshore wind · Clashindarroch Windfarm Extension Limited
145 MWScoping Clashindarroch Windfarm Extension 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Farr WindFarm
Onshore wind · Farr Windfarm Limited
145 MWScoping Farr Wind Farm 132/33Kv Substation
SSEN Transmission (north Scotland)
Jan 2030
Beinneun 2 Windfarm
Onshore wind · Beinneun 2 Limited
144 MWScoping Beinneun Windfarm 2
SSEN Transmission (north Scotland)
Oct 2037
Knockton Wind Farm
Onshore wind · Perigus Energy UK Limited
130 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Glendye Wind Farm
Onshore wind · Glendye Wind Farm Limited
125 MWScoping Glendye Wind Farm Substation
SSEN Transmission (north Scotland)
Oct 2028
Energy Isles
Onshore wind · Energy Isles Shetland Limited
120 MWConsents Approved Energy Isles 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Lethen Wind Farm
Onshore wind · Fred Olsen Renewables Limited
114 MWScoping Lethen Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2033
Teindland Wind Farm
Onshore wind · Teindland Wind Farm Limited
112 MWAwaiting Consents Blackhillock substation
SSEN Transmission (north Scotland)
Sep 2029
Beinneun Wind Farm
Onshore wind · Beinneun Wind Farm Ltd
109 MWBuilt Beinneun 132kV Substation
SSEN Transmission (north Scotland)
Bhlaraidh Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Bhlaraidh 132/33kV Substation
SSEN Transmission (north Scotland)
Gordonbush Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Gordonbush GSP
SSEN Transmission (north Scotland)
Achany Extension Wind Farm
Onshore wind · Sse Generation Limited
105 MWAwaiting Consents ACHANY EXTENSION WIND FARM 132/33KV Substation
SSEN Transmission (north Scotland)
Mar 2028
Creag Riabhach Wind Farm
Onshore wind · Creag Riabhach Wind Farm Ltd
105 MWScoping Creag Riabhach 132/33kV Substation
SSEN Transmission (north Scotland)
Jul 2027
Glentarken Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
104 MWScoping Glentarken Wind Farm 132/33Kv Substation
SSEN Transmission (north Scotland)
Nov 2031
Beaw Field Wind Farm
Onshore wind · Beaw Field Shetland Limited
102 MWConsents Approved Beaw Field 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Bhlaraidh Extension Wind Farm
Onshore wind · Sse Generation Limited
101 MWScoping Bhlaraidh 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2029
Cruach Bhreac Wind Farm
Onshore wind · Statkraft UK Ltd
101 MWScoping Craig Murrail 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Dunach Wind Farm
Onshore wind · Galileo 04 Limited
101 MWScoping Dunach Wind 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Statkraft SEWF
Onshore wind · Statkraft UK Ltd
101 MWScoping Orrin GSP
SSEN Transmission (north Scotland)
Oct 2033
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
100 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
Apr 2034
Car Duibh Wind Farm
Onshore wind · Car Duibh Wind Farm Limited
99 MWAwaiting Consents Car Duibh 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Elchies Wind Farm
Onshore wind · Elchies Wind Limited
99 MWScoping Elchies 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2028
Forsinain Wind Farm
Onshore wind · Forsinain Forest Wind Farm Limited
99 MWScoping Connagill 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Loch Liath Wind Farm
Onshore wind · Loch Liath Wind Farm Limited
99 MWAwaiting Consents Loch Liath 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Ballygroggan Wind Farm
Onshore wind · Dalriada Renewables Limited
96 MWScoping Ballygroggan 132/33Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Chleansaid Wind Farm
Onshore wind · Esb Asset Development UK Limited
96 MWConsents Approved Chleansaid Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Sep 2028
Tangy IV WF
Onshore wind · SSE Renewables Services (UK) Limited
96 MWScoping Tangy IV 132KV Substation
SSEN Transmission (north Scotland)
Apr 2029
Beinn an Tuirc 1
Onshore wind · Scottish Power Renewables (UK) Limited
95 MWScoping Beinn an Tuirc Substation
SSEN Transmission (north Scotland)
Oct 2034
Dunmaglass Wind Farm
Onshore wind · Dunmaglass Wind Farm Limited
94 MWBuilt Dunmaglass 132kV Substation
SSEN Transmission (north Scotland)
Creag Riabhach Wind Farm
Onshore wind · Creag Riabhach Wind Farm Ltd
92 MWBuilt Creag Riabhach 132/33kV Substation
SSEN Transmission (north Scotland)
Pollie Hill Wind Farm
Onshore wind · Pollie Hill Wind Farm Limited
92 MWScoping Pollie Hill Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2031
Farr Wind Farm - Tomatin
Onshore wind · Farr Windfarm Limited
92 MWBuilt Beauly GSP
SSEN Transmission (north Scotland)
Fairburn Extension Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
90 MWScoping Fairburn Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Page 1 of 3

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.