Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETRuith Cnoc
Ruith Cnoc is a 158 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at New Dalchork 132kV Substation, with capacity due from October 2037. The connection agreement is held by Ruith Cnoc Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006147
- Customer
- Ruith Cnoc Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 158 MW
- Change in this agreement
- +158 MW
- Capacity effective from
- 31 October 2037
- Connection site
- New Dalchork 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem