Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SHET

Garvary Wind Farm

Garvary Wind Farm is a 222 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Garvary 132kV Substation, with capacity due from June 2028. The connection agreement is held by Garvary Wind Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001927
Customer
Garvary Wind Farm Limited
Technology
Wind Onshore
Total capacity
222 MW
Change in this agreement
+222 MW
Capacity effective from
30 June 2028
Connection site
Garvary 132kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Garvary Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem