🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Onshore wind

ONSHORE WIND · SHET

Cruach Bhreac Wind Farm

Cruach Bhreac Wind Farm is a 101 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Craig Murrail 275kV Substation, with capacity due from October 2034. The connection agreement is held by Statkraft UK Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003879
Customer
Statkraft UK Ltd
Technology
Wind Onshore
Total capacity
101 MW
Change in this agreement
+101 MW
Capacity effective from
31 October 2034
Connection site
Craig Murrail 275kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Craig Murrail · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem