Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETCruach Bhreac Wind Farm
Cruach Bhreac Wind Farm is a 101 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Craig Murrail 275kV Substation, with capacity due from October 2034. The connection agreement is held by Statkraft UK Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003879
- Customer
- Statkraft UK Ltd
- Technology
- Wind Onshore
- Total capacity
- 101 MW
- Change in this agreement
- +101 MW
- Capacity effective from
- 31 October 2034
- Connection site
- Craig Murrail 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem