ONSHORE WIND · SHETPollie Hill Wind Farm
Pollie Hill Wind Farm is a 92 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Pollie Hill Wind Farm 132Kv Substation, with capacity due from October 2031. The connection agreement is held by Pollie Hill Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003767
- Customer
- Pollie Hill Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 92 MW
- Change in this agreement
- +92 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Pollie Hill Wind Farm 132Kv Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1